Four-zone hotel hot-water system: 2024 contract reference
A historical hotel hot-water contract in China totaling CNY 1.75 million including VAT, with costs for public areas, two guest-room zones and pool temperature control.
Reference published · 2026-11-09
A separate cost for each zone
This 2024 hotel contract divides the hot-water works into public areas, lower-floor guest rooms, upper-floor guest rooms and swimming-pool temperature control. The breakdown provides a reference for comparing zone costs and defining installation interfaces.
Historical contract value
| Item | Contract record |
|---|---|
| Contract date | 19 November 2024 |
| Record type | Historical hot-water works contract |
| Contract value | CNY 1,750,000.00, including VAT |
| VAT rate | Not specified in the contract |
| System zone | Contract value (CNY) |
|---|---|
| Public areas | 627,660.00 |
| Lower-floor guest rooms | 477,545.00 |
| Upper-floor guest rooms | 554,375.00 |
| Pool temperature control | 90,420.00 |
| Total | 1,750,000.00 |
The payment terms allocate CNY 50,000 to a credit for the supplier’s spending at the hotel and CNY 1,700,000 to cash payments. Both form part of the CNY 1,750,000 contract value.
Included work
- Installation and commissioning, plus transport and insurance to the contractual installation location.
- The associated pipework and wiring between the heat pumps, hot-water tanks and control cabinets.
- The four system zones within the scope stated in the contract.
Client interfaces and exclusions
- Equipment foundations and lightning protection are excluded.
- The client brings the cold-water, hot-water and return-water pipes and power cables to the agreed connection points; the supplier makes the connections.
- Building-wide networks, off-site infrastructure and additional works require a defined scope in a new quotation.
Information for a comparable project
- Guest-room and public-area occupancy, peak demand periods and required supply temperature.
- Floor levels, supply pressures and existing zones; pool volume, temperature setpoint and operating hours.
- Equipment to retain, available work periods, shutdown windows, plant locations and electrical supply.
Use these inputs to specify heat sources, storage, circulation and controls, with separate allowances for equipment, installation, associated works and taxes.
Source and use
Source: an anonymized hotel hot-water works contract in the NBWAVE archive, dated 19 November 2024, pages 1–3, covering the four zone costs, payment terms and installation interfaces. The amount is a historical budget reference. Delivery, acceptance and final settlement are established by the relevant project records.
Questions about this reference
Is the contract value CNY 1.70 million or CNY 1.75 million?
It is CNY 1.75 million: CNY 1.70 million in scheduled cash payments plus a CNY 50,000 credit for the supplier’s spending at the hotel. Both amounts belong to the same contract value.
Does the price cover every pipe in the hotel?
The installation scope covers associated pipework and wiring between the heat pumps, hot-water tanks and control cabinets. The client supplies the services to agreed connection points. Equipment foundations and lightning protection are excluded.