Archived hotel hot-water quotations: 144- and 216-person configurations
Two archived hotel configurations priced at CNY 175,432 and CNY 228,138 excluding tax, with 43 kW heat pumps, 455 L tanks and defined installation boundaries.
Reference published · 2026-11-09
Compare each configuration separately
The source sheets are labeled “guest rooms: 144 people” and “guest rooms: 216 people.” These are the sheet labels; sizing a new system also requires peak demand, inlet-water temperature, operating hours and supply requirements. The workbook does not specify whether the sheets represent separate zones or alternative configurations.
Configuration and price
| Item | 144-person sheet | 216-person sheet |
|---|---|---|
| KFXRS-43II/CY heat pumps | 3 units | 4 units |
| CRL-455-15 heating tanks | 3 × 455 L; 15 kW each | 4 × 455 L; 15 kW each |
| CRL-455 storage tanks | 15 × 455 L | 20 × 455 L |
| Installation and commissioning, included in total | CNY 18,900.00 | CNY 25,200.00 |
| Archived total, excluding tax | CNY 175,432.00 | CNY 228,138.00 |
| Quotation date | Not stated in the source | Not stated in the source |
The heat pumps are specified in the source as 43 kW heat output and 9 kW input. Each total covers the equipment, pipework, valves, electrical items and installation in its own schedule. Do not combine the two totals into a single project price.
Historical equipment prices
| Equipment | Archived unit price (CNY, excluding tax) |
|---|---|
| KFXRS-43II/CY heat pump | 20,800.00 |
| CRL-455-15 heating tank | 3,800.00 |
| CRL-455 storage tank | 2,480.00 |
These equipment costs are already included in the respective totals, along with each schedule’s pumps, controls, valves, pipework, insulation, wiring and installation.
Exclusions and client work
- Taxes, concrete equipment foundations, aluminum pipe jacketing and lifting costs are excluded.
- The client provides the main power cable and the hot-water, return-water and cold-water mains to the agreed connection points.
- A separate electric-heating control cabinet is optional and charged separately. Transport has a zero-valued line; confirm the transport arrangements in the project quotation.
Inputs for a hotel quotation
- Guest-room and public-area occupancy, peak demand periods, supply temperature and available energy sources.
- Equipment location, electrical capacity, pipe connections, water pressure and water quality.
- Separate responsibilities for foundations, lifting, pipe jacketing and reinstatement.
Source and use
Source: an archived NBWAVE hotel hot-water quotation workbook with two configuration sheets. Equipment is listed in rows 3–11, totals in row 40 and scope notes in rows 41–52. No quotation date is stated. These are archived quotations, not current offers or records of a sale or project completion.
Questions about this reference
Can CNY 175,432 and CNY 228,138 be added together?
The workbook does not state whether the sheets represent separate zones or alternatives. Use each quotation for its corresponding configuration rather than combining them into one hotel project total.
Do the quotations include tax and lifting?
Both exclude tax, equipment foundations, aluminum pipe jacketing and lifting. Installation and commissioning are included in each stated total.
Request a project quotation